Home > EDUCATION & TRAINING > Wide Placement

Wide Placement

Who should make wide placement slabs?

Only qualified floor finishing contractors.

What is the definition of a wide placement slab?

The definition of wide placement varies greatly depending on the numerous factors and circumstances unique to each job. The important thing to bear in mind is that as the concrete slump decreases and the specified F L numbers and/or ambient temperatures increase, the width of the pour must decrease.

The goal is to select a placement method as wide as practical considering particular requirements and conditions each day. This selection of a wide placement allows the contractor to maximize the benefits of his resources, allows for more timely installation of the slab and reduces construction joints and the problems associated with them.

Why should the wide placement method of slab placement be utilized by a floor contractor?

  • Total footage of construction joint installed will be less.
  • Less labor will be used for hand troweling edges.
  • Delays in starting and stopping will be minimized.
  • Less lighting, as well as labor to install lighting, is needed to illuminate work area.
  • Allows easier tracking of all placing and finishing equipment.
  • Allows easier communication among workers.
  • Two or more trucks can be discharged simultaneously.

Much planning generally precedes successful slab installations. The least productive time frame during the day is usually during starting and stopping of the slab placement. By utilizing wide placements you will increase daily production and reduce total man hours. Due to its high degree of maneuverability and the ability to strike off up to 240 square feet of low slump concrete per minute, the S-240 Laser Screed is a natural answer for making the wide placement method of slab installation practical and efficient while giving the opportunity for higher "F" numbers!

 

Additional Savings & Benefits

  • Less dependence on unreliable help.
  • The ability to consistently screed low slump concrete with a high degree of accurancy.
  • The S-240's maneuverability around columns and obstacles saves much time and energy.
  • Payroll savings realized when there is a jobsite delay - fewer men required means fewer men standing idle due to delays.
  • Ability to big and perform more jobs per year due to increased productivity.
  • Reduced payroll for travel to and from jobsiets - if job is done in six or less days, then six or less days of travel required.
  • Reduced daily mobilization cost to and from jobsite - same reason as above.
  • Reduction in Workers Compensation insurance premiums:
  • 1. Less men = less premiums
    2. Less injuries = lower experience modifier = lower premiums (Machine is doing the backbreaking work.)

  • Substantial reduction in form work.
  • Substantial of exposure to curling at construction joints.
  • Greater accuracy through Laser Technology = greater customer satisfaction.
  • Versatile. Easily handles 3" slump concrete, large aggregate mixes, syntheticand steel fibers.